Straight-line seven-axis continuous line, cycle time 12 SPM.
Straight-line seven-axis continuous line
Hunan
Commissioned in June 2024, it is currently in stable production at 12–15 SPM.
Single-arm high-speed line
Hot-forming stamping line: trial production at 5.9 SPM, the industry’s highest cycle rate.
Thermoforming production line
Hubei
Multi-station system with an aluminum panel takt time of 29 SPM, a leading industry standard.
Multi-station production line
Jiangsu
Multi-station production line
Automatic boxing at the end of the line, with a takt time of 14 SPM.
Automatic packing at the end of the line